Intel has announced it will finish Fab 42 and bring the facility online at the 7nm node. It expects to have the plant operational by 2020 - 2021.
The post Intel will finally finish Fab 42 in Arizona, bring new 7nm capacity online appeared first on ExtremeTech.
from ExtremeTechExtremeTech http://ift.tt/2lrNvx2
ليست هناك تعليقات:
إرسال تعليق